JSR
0
GET A QUOTE →
JSR Contracts Limited operator carrying out specialised equipment removal at the Sainsbury's Ex Homebase site
Specialised Equipment Removal

Sainsbury's Ex HomebaseRefurbishment

Overview

The team safely removed refrigerated panelling installed at approximately 7 metres high, using a scissor lift to provide safe access and a telehandler to carefully lower the panels to ground level, maintaining strict health and safety standards throughout.

Scope Of Works
  • High-level refrigerated panel removal (±7m)
  • Scissor lift access
  • Telehandler panel lowering
Gallery

Project Gallery

Related Service

Mechanical Demolition